AASHTO does permit a preliminary split of the moist sand through a coarse aggregate splitter with chute widths set wide (1½ in. or greater) to a size of not less than 5,000 g.

Enhance your knowledge for the Asphalt Plant Technician Test with our concise and interactive quiz format. Digest the content through well-structured flashcards and multiple-choice questions, complete with explanations. Ace your exam preparation journey!

Multiple Choice

AASHTO does permit a preliminary split of the moist sand through a coarse aggregate splitter with chute widths set wide (1½ in. or greater) to a size of not less than 5,000 g.

Explanation:
Moist samples can clump and segregate, making a representative division more difficult. AASHTO allows a preliminary split of a moist sand using a coarse aggregate splitter with wide chute openings (1½ inches or larger) to produce a sub-sample weighing at least 5,000 g. The wider openings help the material flow and reduce bridging or uneven division, so the sub-sample better represents the whole sample. Having a minimum of 5,000 g ensures there’s enough material for subsequent tests with acceptable precision. So this approach is permitted, which is why the statement is true.

Moist samples can clump and segregate, making a representative division more difficult. AASHTO allows a preliminary split of a moist sand using a coarse aggregate splitter with wide chute openings (1½ inches or larger) to produce a sub-sample weighing at least 5,000 g. The wider openings help the material flow and reduce bridging or uneven division, so the sub-sample better represents the whole sample. Having a minimum of 5,000 g ensures there’s enough material for subsequent tests with acceptable precision. So this approach is permitted, which is why the statement is true.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy